One frequently overlooked area in planning is technical
reviews and inspections. A technical review requires substantial
preparation on the part of the presenters. Documents must be
published and distributed and presentation material organized and
made into slides or overheads. Practice sessions are conducted by
presenters with an audience of critics to prepare for the review.
The reviewers should read the material, attend the
presentations, and write reports. On large projects with many
reviews and walk-throughs involving many participants, a
substantial number of labor hours can be consumed analyzing
documents, attending meetings, and writing reports. For example,
a system design review for one module or unit can require 150
labor hours. When overlooked, this labor can result in a very
large error in resource and schedule estimation.
Many projects include risk assessment and risk
management as a key part of the planning process and expect the
plan toidentify specific risk areas. The plan is expected to
quantify both probability of failure and consequences of failure
and to describe what will be done to contain development risk.

A. Behforooz and F. Hudson. Software engineering
fundamentals. Ed. Oxford (adapted).

Based on the text above, judge the following items.

Some audiovisual materials are required for the presentation of issues to be dealt with.

ID: 267951•
Inglês•
CESPE CEBRASPE•
SERPRO•
Analista Desenvolvimento de Sistemas•
2008

One frequently overlooked area in planning is technical
reviews and inspections. A technical review requires substantial
preparation on the part of the presenters. Documents must be
published and distributed and presentation material organized and
made into slides or overheads. Practice sessions are conducted by
presenters with an audience of critics to prepare for the review.
The reviewers should read the material, attend the
presentations, and write reports. On large projects with many
reviews and walk-throughs involving many participants, a
substantial number of labor hours can be consumed analyzing
documents, attending meetings, and writing reports. For example,
a system design review for one module or unit can require 150
labor hours. When overlooked, this labor can result in a very
large error in resource and schedule estimation.
Many projects include risk assessment and risk
management as a key part of the planning process and expect the
plan toidentify specific risk areas. The plan is expected to
quantify both probability of failure and consequences of failure
and to describe what will be done to contain development risk.

A. Behforooz and F. Hudson. Software engineering
fundamentals. Ed. Oxford (adapted).

Based on the text above, judge the following items.

The presenters should be duly prepared to take part in a technical review.

ID: 267801•
Inglês•
CESPE CEBRASPE•
SERPRO•
Analista Desenvolvimento de Sistemas•
2008

One frequently overlooked area in planning is technical
reviews and inspections. A technical review requires substantial
preparation on the part of the presenters. Documents must be
published and distributed and presentation material organized and
made into slides or overheads. Practice sessions are conducted by
presenters with an audience of critics to prepare for the review.
The reviewers should read the material, attend the
presentations, and write reports. On large projects with many
reviews and walk-throughs involving many participants, a
substantial number of labor hours can be consumed analyzing
documents, attending meetings, and writing reports. For example,
a system design review for one module or unit can require 150
labor hours. When overlooked, this labor can result in a very
large error in resource and schedule estimation.
Many projects include risk assessment and risk
management as a key part of the planning process and expect the
plan toidentify specific risk areas. The plan is expected to
quantify both probability of failure and consequences of failure
and to describe what will be done to contain development risk.

A. Behforooz and F. Hudson. Software engineering
fundamentals. Ed. Oxford (adapted).

Based on the text above, judge the following items.

The plan is supposed to include the likelihood of failure, its results and the actions to be taken to contain development risk.

Gabarite Questões

A plataforma completa com simulados, mapas mentais e questões comentadas para garantir sua vaga.

Plataforma

  • Início
  • Sobre nós
  • Contato
  • Planos
  • Entrar
  • Recuperar senha
  • Cadastrar

Conteúdo

  • Simulados
  • Provas
  • Mapas Mentais
  • Material grátis
  • Apostilas
  • Dicas
  • Notícias

Questões

  • Todas
  • Por Cargo
  • Por Banca
  • Por Disciplina
  • Por Órgão

PREMIUM

Milhares de questões, mapas mentais e apostilas para download.

© 2010-2026 Gabarite Questões.

Termos de UsoPrivacidade
Notificações

Suas atualizações recentes

Nenhuma notificação.